Manufacturing process of double girder bridge crane with open winch of 130 t capacity, 20 m span and 18 m HOL.
Client: Gamesa Eolica
Instalation place: Brasil
The hoist has a motorized rotating hook. Sigue leyendo
Manufacturing process of double girder bridge crane with open winch of 130 t capacity, 20 m span and 18 m HOL.
Client: Gamesa Eolica
Instalation place: Brasil
The hoist has a motorized rotating hook. Sigue leyendo
Manufacturing process of double girder gantry crane with end carriage 40/16 t capacity, 17.9 m span and 14.5 m HOL
Client : Flowserve
Instalation place : Madrid
The hoist motion is performed by a GHF double girder hoist with end carriage, which will work with a 40 t spreader beam. The auxiliary hoist is a GHE single girder hoist in M6 working group both hoist and cross travel motion.
Manufacturing process of two double girder bridge crane KIT, 90/15 t capacity open winch and 19.7 m span.
Client : Constructora Queiroz Galvao
Instalation place : El Salvador
This bridge crane has an auxiliary hoist. A single girder hoist GHF 15 t with 34 m HOL. Cranes will be commanded from a cabin, master/slave, and will include anti-sway system.