Manufacturing and assembly process of a special bridge crane, with the ability to transfer the trolleys to an already installed crane.
It is a double-girder bridge crane, 2×10 t capacity and 25.16 m span, HOL 7.2m.
Client : EADS-CASA CBC (Airbus Military)
Place of installation : El puerto de Santa Maria (Cádiz)