Archivo de la categoría: Noticias

13th International Conference Thermal Treatment of Waste

GH Cranes Poland  – the leader in the market, that supplies advanced automatic cranes to more than a half of incineration plants built in Poland, took part in the 13th International Conference on ‘Thermal Waste Treatment – From Plans To Implementation, that has taken place in Poznań.

gh-cranes-poland-took-part-in-the-13th-international-conference-on-thermal-waste-01

The conference consisted of six sessions about the development of new technologies in thermal waste treatment, operational experience of already existing waste treatment plants and plans of building new installations. It was attended by people of science, investors, general contractors and leading companies that offer new technologies to thermal waste treatment plants.

gh-cranes-poland-took-part-in-the-13th-international-conference-on-thermal-waste-02

Plans are already a few years behind us, behind us is also the whole cycle of pre-investment and investment of construction of the municipal waste thermal treatment plants. The WtE plants in Poland now became a reality. Approximately one million tons of municipal waste per year gets to the grid of WtE plant,  thus introducing national waste management on a much higher level of its advancement. This process has placed Poland in the group of EU countries, that are basing their waste management system not only on landfilling, allowing at the same time to get closer to latest standards and challenges given by a circular economy.

GH improves hook side approaches to enable narrower buildings

We’ve optimised the hook’s side approach in the new GH hoist so that it can get as close to the walls as possible.

This brings two benefits to the customer.

7diferencias3-3

He can build narrower plants and save in heating.

Since the side reaches are better there’s less wasted room.

7diferencias3-5

For example, for a building with a 22.5 metre span, with GH the building’s width is 3.2% smaller.

If we quantify the money saved in building materials we’ll see that with GH it’s as much as 43,549 €. 

7diferencias3-7

And in heating we’d be spending 6,316 € less per year.

7diferencias3-9

To sum up, GH has optimised the side reaches of all its hoist up to 12.5 t so that customers can save up in building materials and heating.

For more information: https://www.ghcranes.com/en/information/videos/7-key-questions-for-a-crane-manufacturer-of-xxi-century/

El Grupo Armando Álvarez vuelve a confiar en Mainsa Poligrúas y GH para reforzar su equipamiento

Nuevamente el Grupo Armando Álvarez vuelve a confiar en la experiencia y el buen hacer de Mainsa Poligrúas para una ampliación/renovación de maquinaria o soluciones de elevación.

20160714024431 20160714024423

En esta ocasión con motivo de la ampliación y mejora de la nave de maderas y envases, Mainsa Poligrúas, previo estudio llevado a cabo por nuestro equipo de ingeniería, suministró e instaló los elementos de elevación y transporte necesarios para lograr el manejo más rápido y seguro del producto y se incorporaron los siguientes productos para alcanzar los objetivos marcados:

* Puente Grua Birrail 12,5 tn

* Útil elevación a medida 12,5 tn

* Carretón para el transvase de producto entre sus dos naves.

Fuente: www.mainsapoligruas.com