Assembly of a GH jib crane with a lifting capacity of 5t, a height of 5m and a length of 8 metres, installed in Puerto Berrio, in Colombia, on the banks of the Magdalena River.
follow us on
ACCIONA Windpower’s main market (Brazil)
The ACCIONA Group has contracts in the country – either signed or contingent - for the supply of turbines totaling 837 megawatts (MW).
Lecitrailer Corporative video 2014
Lecitrailer Corporative video 2014, Spanish towing and semi-towing manufacturer.
Harbin Hafei Airbus
Composite Manufacturing Centre - Opening Ceremony 28 February 2011