INFORMATIONGH / VIDEOS

Video of installation plant Ternium Siderar, Argentina

Plant installation at Siderar, San Nicolás, Buenos Aires.


Among other things we mounted a bridge crane of 75 / 20t, 7 jib cranes of 2t and 3t and a gantry crane of 2x80 ton.

Installation by our Ingytec Argentina.(www.ingytec.com)

follow us on  GH Youtube