With the use of the GH CRANES & COMPONENTS gantry cranes the prefabricated concrete voussoirs are transported into the tunnel. The three tunnelling machines that are operating carry out the task of lining the tunnel with the voussoirs.
follow us on
New factory in Pichon S.A.
The process of building the new facilities of the company Pichon, in which several bridge crane installed by GH CRANES & COMPONENTS Crane & Components.