Factory of segments and platform to entrance the tunnel.
2 x 20 t bridge crane used for the maintenance of precast concrete segments for the coating of the tunnel that connecting France and Italy, from Sant-Jean-de-Maurienne to Susa, allowing communication between Lyon and Turin.
跟隨我們
Escoriatza Aramaio分段,西班牙高速铁路,Vitoria Bilbao San Sebastián